dc.contributor.author |
Haq, Ahteshamul |
|
dc.contributor.author |
Srinivasan, Babji |
|
dc.contributor.author |
Bonvin, Dominique |
|
dc.coverage.spatial |
Switzerland |
|
dc.date.accessioned |
2022-06-16T10:35:57Z |
|
dc.date.available |
2022-06-16T10:35:57Z |
|
dc.date.issued |
2022-05 |
|
dc.identifier.citation |
Haq, Ahteshamul; Srinivasan, Babji and Bonvin, Dominique, "Real-time optimization of wastewater treatment plants via constraint adaptation", Processes, DOI: 10.3390/pr10050990, vol. 10, no. 5, May 2022. |
en_US |
dc.identifier.issn |
2227-9717 |
|
dc.identifier.uri |
https://doi.org/10.3390/pr10050990 |
|
dc.identifier.uri |
https://repository.iitgn.ac.in/handle/123456789/7810 |
|
dc.description.abstract |
An important requirement of wastewater treatment plants (WWTPs) is compliance withthe local regulations on effluent discharge, which are going to become more stringent in the future.The operation of WWTPs exhibits a trade-off between operational cost and effluent quality, whichprovides a scope for optimization. Process optimization is usually done by optimizing a model of theprocess. However, due to inevitable plant-model mismatch, the computed optimal solution is usuallynot optimal for the plant. This study represents the first attempt to handle plant-model mismatchvia constraint adaptation (CA) for the real-time optimization of WWTPs. In this simulation study,the "plant" is a model adopted from the BSM1 benchmark, while a reduced-order "model" is usedfor making predictions and computing the optimal inputs. A first implementation uses steady-statemeasurements of the plant constraints to adjust the model in the optimization framework. A fast CAtechnique is also proposed, which adjusts the model using transient measurements. It is observedthat, even in the presence of significant plant-model mismatch, the two proposed techniques are ableto meet the active plant constraints. These techniques are found to reduce the pumping and aerationenergy by 20%, as compared to that adopted in BSM1. |
|
dc.description.statementofresponsibility |
by Ahteshamul Haq, Babji Srinivasan and Dominique Bonvin |
|
dc.format.extent |
vol. 10, no. 5 |
|
dc.language.iso |
en_US |
en_US |
dc.publisher |
MDPI |
en_US |
dc.subject |
WWTP |
en_US |
dc.subject |
BSM1 |
en_US |
dc.subject |
Real-time optimization |
en_US |
dc.subject |
Constraint adaptation |
en_US |
dc.subject |
Fast constraint adaptation |
en_US |
dc.title |
Real-time optimization of wastewater treatment plants via constraint adaptation |
en_US |
dc.type |
Article |
en_US |
dc.relation.journal |
Processes |
|