Real-time optimization of wastewater treatment plants via constraint adaptation

Show simple item record

dc.contributor.author Haq, Ahteshamul
dc.contributor.author Srinivasan, Babji
dc.contributor.author Bonvin, Dominique
dc.coverage.spatial Switzerland
dc.date.accessioned 2022-06-16T10:35:57Z
dc.date.available 2022-06-16T10:35:57Z
dc.date.issued 2022-05
dc.identifier.citation Haq, Ahteshamul; Srinivasan, Babji and Bonvin, Dominique, "Real-time optimization of wastewater treatment plants via constraint adaptation", Processes, DOI: 10.3390/pr10050990, vol. 10, no. 5, May 2022. en_US
dc.identifier.issn 2227-9717
dc.identifier.uri https://doi.org/10.3390/pr10050990
dc.identifier.uri https://repository.iitgn.ac.in/handle/123456789/7810
dc.description.abstract An important requirement of wastewater treatment plants (WWTPs) is compliance withthe local regulations on effluent discharge, which are going to become more stringent in the future.The operation of WWTPs exhibits a trade-off between operational cost and effluent quality, whichprovides a scope for optimization. Process optimization is usually done by optimizing a model of theprocess. However, due to inevitable plant-model mismatch, the computed optimal solution is usuallynot optimal for the plant. This study represents the first attempt to handle plant-model mismatchvia constraint adaptation (CA) for the real-time optimization of WWTPs. In this simulation study,the "plant" is a model adopted from the BSM1 benchmark, while a reduced-order "model" is usedfor making predictions and computing the optimal inputs. A first implementation uses steady-statemeasurements of the plant constraints to adjust the model in the optimization framework. A fast CAtechnique is also proposed, which adjusts the model using transient measurements. It is observedthat, even in the presence of significant plant-model mismatch, the two proposed techniques are ableto meet the active plant constraints. These techniques are found to reduce the pumping and aerationenergy by 20%, as compared to that adopted in BSM1.
dc.description.statementofresponsibility by Ahteshamul Haq, Babji Srinivasan and Dominique Bonvin
dc.format.extent vol. 10, no. 5
dc.language.iso en_US en_US
dc.publisher MDPI en_US
dc.subject WWTP en_US
dc.subject BSM1 en_US
dc.subject Real-time optimization en_US
dc.subject Constraint adaptation en_US
dc.subject Fast constraint adaptation en_US
dc.title Real-time optimization of wastewater treatment plants via constraint adaptation en_US
dc.type Article en_US
dc.relation.journal Processes


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search Digital Repository


Browse

My Account